Home     Picture Gallery

August 21, 2010 Update

A year in review



Track parts being organized behind the Roundhouse.


Footings for the Gallows signal.

Gallows signal first "floor" completed.


Gallows signal with the main post erected.


CV 4052 Caboose with new woodwork and floor.

Last wall of Roundhouse stall #2 being rebuilt.

Roundhouse stall #2 rebuilt.

Reclaimed rail from Rocky Hill.


Repainted signal parts.


Ash Pit/Caboose switch almost complete.



Copyright 2002-2010 Connecticut Eastern Chapter, National Railway Historical Society

Photos on this page are by and 2010 Andrew Fischer