Home
Picture Gallery
August 21, 2010 Update
A year in review
Track parts being organized behind the Roundhouse.
Footings for the Gallows signal.
Gallows signal first "floor" completed.
Gallows signal with the main post erected.
CV 4052 Caboose with new woodwork and floor.
Last wall of Roundhouse stall #2 being rebuilt.
Roundhouse stall #2 rebuilt.
Reclaimed rail from Rocky Hill.
Repainted signal parts.
Ash Pit/Caboose switch almost complete.
Copyright ©2002-2010 Connecticut Eastern Chapter, National Railway Historical Society
Photos on this page are by and ©2010 Andrew Fischer