Home     Picture Gallery

April 12th 2008

I will be away for the next few weeks, so no updating, sorry.



The ties have been placed to pit stall number 1.



One of the round house doors being fixed up and soon to be painted.

The door having a lead cap installed to protect the exposed end grains.

This is a rare shot of the freight house siding, there is nothing on it!

And what would be a web site update without a picture of someone tamping.


Pit #4 in the roundhouse, the main ties have been installed and will be lagged down.



Copyright 2002-2008 Connecticut Eastern Chapter, National Railway Historical Society

Photos on this page are by and 2008 Andrew Fischer